Cost-Effective Submetering System for a Theatre

Phoenix almérők beszerelve

Not every metering project requires a complex data collection platform, continuous cloud connectivity or sophisticated dashboards. Sometimes the objective is much simpler: to meet the required measurement needs reliably, with a straightforward solution and a carefully controlled investment cost. That was the objective of this theatre project. OMS24 Zrt. implemented nine three-phase electrical submetering points, […]

Tennis Court Lighting Automation – Remote Control of 96 Floodlights

Teniszpálya világítási elosztószekrény Shelly távvezérléssel

Tennis Court Lighting Automation – Remote Control of 96 Floodlights Automation does not necessarily require a complex building management system or a complete technological rebuild. Sometimes the task is much simpler: how can an existing system be upgraded so that it requires less manual intervention? In this project, there was nothing wrong with the lighting […]

8 kW Hybrid Inverter with 10 kWh Battery Storage

Deye hibrid inverter áttekintő kép

Kezdőlap The client’s original request sounded simple: keep the entire house running during a power outage. Many things are technically possible. The more important question is whether they can be achieved at a reasonable cost. A residential client approached OMS24 Zrt. to improve the resilience of the property’s electricity supply by introducing battery-backed power. The […]

Hotel Submetering – 60 Metering Points in One Integrated System

ETON áramváltók felszerelve

When implementing submetering in an existing building, the project rarely starts with a completely clean slate. There may already be functioning meters, existing data collection solutions and technical infrastructure that should not be replaced simply because additional metering points are being introduced. That was exactly the situation in this hotel project. The objective was to […]

Hotel Submetering System – Flexible Measurement Without Shutdown

Phoenix fogyasztásmérők felszerelve OMS24 Zrt.

An electrical system refurbishment is a good opportunity not only to improve how electricity is distributed, but also to gain a better understanding of where and how it is being used. During the refurbishment of a hotel’s electrical network, the client decided to introduce separate metering for several important outgoing circuits. OMS24 Zrt. implemented eight […]

400 kW Rooftop Solar PV System for a Manufacturing Site

Ipari napelem telepítés

When designing an industrial solar PV system, the objective is not necessarily to install as many panels as possible on the available roof area. A more important question is how well solar generation matches the actual electricity demand of the site. OMS24 Zrt. delivered a 400 kW rooftop solar PV system for a manufacturing facility. […]

Residential Solar PV Installations

Napelem telepítés cseréptetőn

The primary focus of OMS24 Zrt.’s energy business is on commercial and industrial energy solutions. Over the years, however, we have also delivered a number of residential solar PV systems. These projects may be smaller in scale than our industrial installations, but the underlying engineering principle remains the same: the system should not simply work […]

Nationwide Submetering System – 663 Meters Across 16 Sites

Wago fogyasztásmérő felszerelése OMS24 Zrt.

When implementing a nationwide metering system, installing the individual meters is not the greatest challenge. The real task is to ensure that hundreds of metering points, multiple sites, different electrical environments and a central data collection system ultimately operate as one integrated solution. In summer 2025, OMS24 Zrt. completed the physical metering infrastructure for a […]

Electrical Submetering for Water Utility Sites

Bontható áramváltó beépítés OMS24 Zrt.

In November 2025, OMS24 Zrt. began working with Nemzeti Vízművek Zrt. on the implementation of electrical submetering systems. The first project involved the installation of 22 three-phase electrical submetering points across five Mezőföldvíz Kft. sites in Dunaújváros. The task, however, was not simply to install meters. The objective was to ensure that the electrical measurement […]

Automated Metering Data Collection – From 3 Hours to 5 Minutes

Mérés adatgyűjtés automatizálás beállítás OMS24 Zrt.

Some tasks are not particularly difficult. They simply have to be repeated every single month. OMS24 Zrt. had previously installed submeters for several clients located across different parts of Hungary. As part of the service, these clients received monthly reports based on their 15-minute interval consumption data. Initially, this process was handled manually. For each […]